INTERIOR STUDIO
+38 097930 71 05 +42 077454 43 04
Call back
Organization of living space

– these are changes that determine the internal structure of the interior: the number and size of rooms, their location, the spatial connection of the rooms.
Read more>>

Redevelopment belongs to the category of primary means of interior design, perhaps that is why the prospect of changes of such complexity frightens people. We all advocate for improving the quality of space, but not everyone will risk moving walls, building partitions, dividing volume into levels, using empty rooms (for example, an attic or basement) and re-equipping and decorating them in accordance with building rules for residential premises.

It should be noted that changes to the planning organization vary significantly in level of complexity and costs and, in turn, depend on whether the supporting structure of the house will be affected. For example, cutting an opening in an internal wall is much easier than performing the same operation in a load-bearing wall. If you have the most accurate information on this issue, know where and what difficulties await you, and prepare most thoroughly for the redevelopment, then we are sure that you are guaranteed success. You may not be able to make large-scale changes on your own, and this is sometimes risky. Seek help from an architect who will tell you which structures are load-bearing and which are internal, and hire experienced and qualified builders to implement your project.

Organization of living space

Services

Design project: Project composition:

  1. Measurement plan.
  2. Sketch plan for redevelopment.
  3. Sketch plan for furniture arrangement.
  4. Dismantling plan.
  5. Installation plan.
  6. Installation plan for electrical products – power and low current.
  7. Lighting plan, indicating types of lighting fixtures.
  8. Floor plan (indicating coverings).
  9. Ceiling plan (indicating coatings), necessary components and sections of the ceiling.
  10. Development of color and style solutions for the interior.
  11. Kitchen furniture project with equipment and electrical connections.
  12. Developments of internal surfaces of walls, necessary cuts.
  13. Tile layout.
  14. Door plan.
  15. Door specification.
  16. Specification of sanitary equipment
  17. Specification of electrical products.
  18. Specification for tiles and flooring.
  19. Visualization of premises (2-3 angles 3d max, vray)
  20. List of finishing materials.

Visualization (interiors, exteriors, subject) – assessed individually

Author’s supervision: Author’s supervision includes:
  • Regular visits by the project author (no more than 4 times a month) throughout the entire duration of the contract
  • Control of work carried out in accordance with the design project
  • Communication with the foreman at the site, incl. and by phone (consultations on all provided drawings)
  • Making changes to the project that arose after dismantling old partitions and erecting new partitions, after leveling floors, walls and ceilings
  • Ordering equipment and finishing materials (on behalf and on behalf of the Customer).
  • Placement of decorative elements in the interior (curtains, paintings, vases, mirrors, etc.)

Why is author’s supervision needed? Architectural supervision is one of the special types of work of an architect and designer. During designer supervision, they monitor the implementation of construction and repair work at sites. To ensure that everything goes according to plan, the authors of the design project take care of this throughout the entire time, right up to the end of the work. What does designer supervision include? Who needs architectural supervision? Anyone who has already undergone the test of construction and renovation work knows that many questions arise during the process. All of them require a quick, qualified solution. Unfortunately, the lack of relevant experience negates any attempts to resolve pressing problems. To keep all work at the entrusted site under strict control, you need to appear on site several times a week. It is during such visits that various issues are resolved, the design project is adjusted, the import of new and replacement of unnecessary materials is agreed upon. This is the only way to declare control of construction and repair work. Everyone needs to decide for themselves whether copyright supervision is needed.

Share: