- Interior Design
- Author’s supervision
- Architectural project.
- Project. entrance groups
- Project. facades
- Repair work
- Measurement drawing with reference to utilities.
- Options for planning solutions (2-3 options before final approval).
- Approved plan after redevelopment.
- Scheme of construction dismantling of partitions.
- Scheme of construction of new partitions.
- Diagram of doorways.
- Room marking scheme.
- Layout of lighting fixtures on the ceiling.
- Ceiling diagram.
- Diagram of lighting fixture switching positions.
- Layout of electrical outlets, sockets and switches.
- Air conditioning circuit.
- Plumbing equipment layout plan.
- Flooring scheme.
- Laying scheme for heated floors
- Laying tiles on the walls of the room.
- Scheme of wall finishing materials. Specification of materials.
- Wall developments.
- Visualization of the interior in the 3D Studio Max program 4-8 angles for each room.
The price of a design project is estimated individually, depending on the total area of the premises (by floor), complexity, style and purpose of the object.
— There is a discount system for regular customers.
— If construction work is carried out by our organization for author’s support, a special offer!
Design supervision includes:
- visit of the architect to the site (no more than four visits per month);
- making adjustments to working drawings that arose after dismantling old partitions and erecting new partitions, after leveling floors, walls and ceilings;
- consultations and monitoring of compliance with the implementation of this project;
- selection of wall finishing materials;
- selection of floor coverings;
- selection of furniture;
- selection of lighting fixtures;
- selection of electrical accessories;
- selection of decor;
The price of architectural supervision is 10% of the total estimate. Paid in installments every 1st day of the new month. Schedule of site visits 2-3 times a month. Transport costs are paid separately.
If construction work is carried out by our organization for author support, a special offer!
Sketch design is the creation of a general concept for a future building, its style direction, and a solution to the interior space.
Sketch design includes:
- planning solution;
- visualization in the 3D Studio Max program (the size of printed pictures is 2-4 angles;
- floor plans, facades and sections (in dimensions);
The price depends on the area of the object and the level of complexity. Evaluated individually.
Entrance groups are the most important component of a building. Any repair and finishing of facades involves the construction of entrance lobbies. Projects for entrance groups can be of varying complexity and cost, but must always fit into the overall concept of the building and its facade. They require a definition of architectural concept and style. If there is a ready-made, designed and finished facade, the style of the entrance group is selected to match it.
The price for designing entrance groups depends on the area, style and level of complexity. Evaluated individually.
Architectural design of facades is carried out both for existing buildings and for newly created buildings and includes style direction, color scheme, and selection of various materials.
The price depends on the area, style and level of complexity. Evaluated individually.
Price list for repair and construction work
Name of works |
Unit. |
Price |
|
CEILINGS WALLS |
|||
PLASTERING AND PAINTING WORKS: |
|||
1 |
Installation of chain-link mesh under plaster |
Sq.m |
40.0 |
2 |
Plastering with ready-made gypsum mixture manually/machine |
Sq.m |
125.0 |
3 |
Lighthouse plaster (layer up to 4cm) |
Sq.m |
125.0 |
4 |
Additional lighthouse plaster (layer over 4cm) |
Sq.m |
Agreement |
5 |
Primer of walls, ceiling, floor |
Sq.m |
12.0 |
6 |
Starting putty, regardless of the layer (Slope – width up to 50cm) |
Sq.m/p.m |
70.0 |
7 |
Finishing putty, regardless of the layer (Slope – width up to 50cm) |
Sq.m/p.m |
80.0 |
8 |
Puttying radius surfaces |
Sq.m/p.m |
95.0 |
9 |
Puttying hot-smoked joints with mesh |
P.m |
25.0 |
10 |
Pasting the surface with a mesh for putty |
Sq.m |
40.0 |
eleven |
Installation of radius perforation angle |
P.m |
50.0 |
12 |
Installation of perforated corner |
P.m |
30.0 |
13 |
Forming an internal corner junction |
P.m |
40.0 |
14 |
Forming an outer corner junction |
P.m |
66.0 |
15 |
Sealing the electrical groove |
P.m |
40.0 |
16 |
Seal of plumbing grooves |
P.m |
60.0 |
FRIES: |
|||
1 |
Gluing a regular frieze (expanded polystyrene) |
P.m |
45.0 |
2 |
Gluing, puttying, sanding of p/urethanes, gypsum frieze (width up to 10cm) |
P.m |
135.0 |
3 |
Gluing, puttying, polishing of p/urethanes, plaster. frieze (width over 10cm) |
P.m |
175.0 |
4 |
Painting a regular frieze |
P.m |
25.0 |
5 |
Painting the polyurethane frieze |
P.m |
35.0 |
WALLPAPER: |
|||
1 |
Gluing fiberglass, wallpaper for painting, patent fleece (walls/ceiling) |
Sq.m/l.m |
75.0 |
2 |
Pasting ready-made paper-based wallpaper |
Sq.m/p.m |
85.0 |
3 |
Pasting textile, decorative and photo wallpapers |
Sq.m/p.m |
Doghorn |
PAINTING: |
|||
1 |
Painting in 2-3 layers with a roller |
Sq.m/p.m |
60.0 |
2 |
Spray painting |
Sq.m/p.m |
65.0 |
3 |
Additional coat of paint with a roller |
Sq.m |
35.0 |
4 |
Painting with oil paint |
Sq.m |
75.0 |
FLOORS |
|||
PREPARATORY STAGE |
|||
1 |
Waterproofing with a mixture of 2-3 layers |
Sq.m |
60.0 |
2 |
Laying a vapor barrier, a hydraulic barrier |
Sq.m |
25.0 |
3 |
Application of concrete contact |
Sq.m |
25.0 |
4 |
Laying a thermal joint around the perimeter of the poured floor |
P.m |
15.0 |
5 |
Foam insulation with foam sealing of seams |
Sq.m |
60.0 |
6 |
Laying VR mesh |
Sq.m |
35.0 |
7 |
Knitting reinforcement |
Sq.m |
65.0 |
8 |
Floor concreting |
Sq.m |
150.0 |
9 |
Floor screed |
Sq.m |
150.0 |
10 |
Filling the floor with leveling compound |
Sq.m |
130.0 |
eleven |
Laying chipboard, gypsum fiber board. Plywood (separately) |
Sq.m |
Agreement |
FINAL COATING |
|||
1 |
Laying parquet boards |
Sq.m |
Agreement |
2 |
Laying laminate flooring with underlay |
Sq.m |
100.0 |
3 |
Diagonal laying of laminate flooring with underlay |
Sq.m |
120.0 |
4 |
Laying linoleum |
Sq.m |
100.0 |
5 |
Installation of the adapter strip |
P.m |
110.0 |
SKIRTING BOARDS |
|||
1 |
Installation of skirting boards (plastic) |
P.m |
60.0 |
2 |
Installation of MDF plinth |
P.m |
From 80.0 |
3 |
Installation of MDF plinth (radius) |
P.m |
Agreement |
CEILING AND WALL STRUCTURES |
|||
GYPSOCARDBOARD WITH INSULATION |
|||
1 |
Installation of false walls and slopes (direct) |
Sq.m/p.m |
160.0 |
2 |
Installation of false walls (radius) |
Sq.m/p.m |
220.0 |
3 |
Ceiling installation (direct) |
Sq.m |
180.0 |
4 |
Partition installation |
Sq.m |
180.0 |
5 |
Stripe of the second layer of g/cardboard |
Sq.m |
70.0 |
6 |
Construction of slopes made of polystyrene foam |
P.m |
100.0 |
7 |
Laying insulation |
Sq.m |
60.0 |
8 |
Laying insulation (ceiling) |
Sq.m |
70.0 |
9 |
Installation of plastic, MDF |
Sq.m |
140.0 |
10 |
Gluing external corners of MDF type |
P.m |
25.0 |
eleven |
Cutting a hole in cardboard for the ventilation grille |
PC |
40.0 |
12 |
Installation of ventilation grilles |
PC |
45.0 |
13 |
Window sill installation |
P.m |
200.0 |
ARMSTRONG |
|||
1 |
Armstrong suspended ceiling installation |
Sq.m |
120.0 |
2 |
Installation of Armstrong suspended ceiling with chamfer |
Sq.m |
120.0 |
3 |
Replacing Armstrong slabs |
PC |
25.0 |
MASONRY |
|||
1 |
Foam block laying 100x300x600 |
PC |
23.0 |
2 |
Foam block laying 200x300x600 |
PC |
28.0 |
3 |
Bricklaying (white, red) |
PC |
6.0 |
DOOR STRUCTURES |
|||
1 |
Installation of door stops |
PC |
60.0 |
2 |
Installation of a door block with insertion of door fittings (standard) |
PC |
850.0 |
3 |
Painting the door block (standard) |
PC |
650.0 |
TILE |
|||
1 |
Primer of walls, ceiling, floor |
Sq.m |
12.0 |
2 |
Tile laying |
Sq.m |
500.0 |
3 |
Laying tiles 10×10 |
Sq.m |
600.0 |
4 |
Mosaic laying |
Sq.m |
From 700.0 |
5 |
Trimming a 45 degree corner |
P.m |
Cut center |
6 |
Bathtub cover (brick) |
Sum |
950.0 |
7 |
Laying a ceramic frieze |
P.m |
150.0 |
8 |
Grouting tiles |
Sq.m |
42.0 |
9 |
Grouting seams on relief tiles |
Sq.m |
53.0 |
10 |
Cutting holes |
PC |
85.0 |
eleven |
Installation of magnetic revision |
PC |
260.0 |
12 |
Installation of inspection door |
PC |
315.0 |
13 |
Installation of a metal decorative corner |
P.m |
50.0 |
PLUMBING |
|||
REPLACEMENT OF RISERS |
|||
1 |
Replacement of heating and water supply risers 3/4 |
PC |
900.0 |
2 |
Replacement of heating and water supply risers 1 |
PC |
950.0 |
3 |
Replacement of heating and water supply risers 1 1/4 |
PC |
1000.0 |
4 |
Replacement of sewer risers (F50) |
PC |
900.0 |
5 |
Replacement of sewer risers (F110) |
PC |
1000.0 |
6 |
Replacement of sewer risers (F160) |
PC |
1260.0 |
PLUMBING WIRING |
|||
1 |
Heating wiring and radiator installation |
Dot |
750.0 |
2 |
Installation of an in-floor radiator with wiring |
PC |
860.0 |
3 |
Plumbing (cold water) without installation (up to 3p.m) |
Dot |
300.0 |
4 |
Plumbing (hot water) without installation (up to 3p.m) |
Dot |
300.0 |
5 |
Sewerage installation without installation (up to 3p.m) |
Dot |
300.0 |
PREPARATORY WORK |
|||
1 |
Punching holes through ceilings |
PC. |
350.0 |
2 |
Punching holes through walls |
PC. |
85.0 |
3 |
Cutting grooves in brick (up to Ф100mm) |
P.m |
105.0 |
4 |
Punching grooves in brick (over Ф100mm) |
P.m |
160.0 |
5 |
Cutting grooves in concrete (up to Ф100) |
PC. |
170.0 |
6 |
Cutting grooves in concrete (over Ф100mm) |
PC. |
210.0 |
LAYING THE PIPELINE |
|||
1 |
Pipeline laying Ф20 –50 |
P.m |
50.0 |
2 |
Laying the F50 pipeline |
P.m. |
60.0 |
3 |
Laying the F100 pipeline |
P.m |
85.0 |
4 |
Pipeline laying (street)(F100) |
P.m |
140.0 |
5 |
Thermal insulation of pipes (marlon) |
P.m |
15.0 |
6 |
Painting metal pipes (required) |
P.m |
35.0 |
DISASSEMBLY OF PLUMBING EQUIPMENT |
|||
1 |
Dismantling radiators (counts if installed ones are removed) |
PC |
80.0 |
INSTALLATION OF DEVICES |
|||
1 |
Meter installation |
PC. |
315.0 |
2 |
Installing a fine and coarse filter |
PC |
315.0 |
3 |
Installation of toilet, washbasin, washing machine |
PC |
470.0 |
3 |
Water heater installation |
PC. |
525.0 |
4 |
Starting the heating system |
PC |
790.0 |
5 |
Connecting a water heated towel rail with installation |
PC |
265.0 |
6 |
Bathtub faucet installation |
PC |
315.0 |
7 |
Installation of a built-in mixer |
PC |
475.0 |
8 |
Installation of a shower rod |
PC |
230.0 |
9 |
Installation and piping of a water heated floor frame |
PC |
1400.0 |
10 |
Assembly and installation of the collector |
PC |
1400.0 |
eleven |
Installation of a conventional bath (steel, cast iron) |
PC |
735.0 |
12 |
Installation of an acrylic bathtub with a panel |
PC |
870.0 |
13 |
Installing a hot tub |
From |
1250.0 |
14 |
Installation of a shower stall |
From |
1250.0 |
15 |
Installation of a shower tray |
PC |
580.0 |
16 |
Installation and connection of a kitchen sink |
PC |
460.0 |
17 |
Installation of a drain ladder |
PC |
265.0 |
18 |
Warm floor |
Sq.m |
190.0 |
19 |
Installation of sanitary accessories (hooks, paper holders, etc.) |
PC |
75.0 |
BOILER INSTALLATION |
|||
1 |
Installation of valves separately |
PC |
75.0 |
2 |
Replacing valves |
PC |
105.0 |
3 |
Installing radiators separately |
PC |
95.0 |
4 |
Installation installation |
PC |
700.0 |
5 |
Installation of embedded parts for plumbing fixtures |
PC |
135.0 |
6 |
Installation of a pressure booster pump |
PC |
420.0 |
7 |
Installation of a wall-mounted boiler |
From |
1850.0 |
8 |
Installation of a floor-standing boiler |
From |
3150.0 |
9 |
After-hours trip |
Sum |
580.0 |
10 |
Drawing up a work estimate |
PC |
580.0 |
ELECTRICAL |
|||
1 |
Brick grooves |
P.m |
60.0 |
2 |
Grooves for concrete |
P.m |
80.0 |
3 |
Junction box |
PC |
110.0 |
4 |
Electric point 100% cost (socket, switch, automatic, spotlight |
PC |
110.0 |
5 |
50% of the cost of the point – wire output, considered if the work is done in stages |
PC |
55.0 |
6 |
20% of the cost of the point – installation of a socket box, considered if the work is a poet |
PC |
25.0 |
7 |
30% of the cost of the point, installation of electrical fittings, considered if staged |
PC |
30.0 |
8 |
Installation of transformer 12v, 24v, 36v |
PC |
70.0 |
9 |
Installation of LED cord (hidden light) |
P.m |
55.0 |
10 |
Installation of LED cord (colored light) |
PC. |
85.0 |
eleven |
Installation of an aluminum box for hidden light |
PC |
55.0 |
12 |
Installation of distribution board without complete set |
PC |
250.0 |
13 |
Installation of space for the distribution panel (dismantling brick, concrete) |
PC |
250.0 |
14 |
Installation of 1-phase RCD |
PC |
110.0 |
15 |
Installation of an electric fan without a wire outlet |
PC |
110.0 |
16 |
Connecting an electric towel rail with installation |
PC |
210.0 |
17 |
Cutting holes for boxes (brick) |
PC |
20.0 |
18 |
Cutting holes for boxes (concrete) |
PC |
37.0 |
19 |
Pulling the wire into the corrugation |
P.m |
8.0 |
20 |
Installation of a plastic box (laying wires in the box) |
P.m |
30.0 |
21 |
Laying wires in a pipe with steel wire |
P.m |
20.0 |
22 |
Those. holes |
PC |
35.0 |
23 |
Installation and connection of the meter |
PC |
315.0 |
24 |
Wire routing |
P.m |
12.0 |
25 |
Laying of power wire with a cross-section of up to 10 kV |
P.m |
20.0 |
26 |
Wire laying (acoustics, telephone, internet) |
P.m |
20.0 |
27 |
Installation of 3-phase RCD |
PC |
170.0 |
28 |
Installation of 3-phase automatic machines |
PC |
110.0 |
29 |
Installation of 3-phase distribution box |
PC |
125.0 |
thirty |
Installation of sconces |
PC |
125.0 |
31 |
Installation of built-in raster lamp |
PC |
125.0 |
32 |
Installation of overhead raster lamp |
PC |
170.0 |
33 |
Installation of a chandelier 3-5 bulbs |
PC |
315.0 |
34 |
Installation of a 1-phase voltage relay |
PC |
160.0 |
35 |
Installation of 3-phase voltage relay |
PC |
190.0 |
36 |
Installation of a 3-phase magnetic starter |
PC |
190.0 |
37 |
Pulling the cable during the finished repair behind cardboard |
P.m |
42.0 |
38 |
Connecting the oven and hob |
PC |
190.0 |
39 |
Cable extension |
Place |
42.0 |
40 |
Dial-up of existing electrics |
H/day |
315.0 |
41 |
Chandelier with assembly |
PC |
Dogov |
42 |
Installation of a 1-phase voltage stabilizer |
PC |
Dogov |
43 |
Installation of a 3-phase voltage stabilizer |
PC |
Dogov |
44 |
Relocating the electrical point when changing the location (customer’s request) |
Sum |
Dogov |
46 |
Drawing up a work estimate |
Sum |
315.0 |
47 |
After-hours trip |
Sum |
315.0 |
AUXILIARY WORKS |
|||
1 |
Covering floors and walls with plastic film |
Sq.m |
5.0 |
2 |
Ancillary work |
Hour |
80.0 |
3 |
Lifting materials (weight up to 30kg) |
Floor |
3.0 |
4 |
Lifting large-sized materials (cardboard, OSB, etc.) |
Floor |
6.0 |
5 |
Dismantling of scaffolding |
Sq.m |
15.0 |
6 |
Installation of scaffolding |
Sq.m |
30.0 |
7 |
Preparation of working estimates |
PC |
800.0 |
8 |
Transport/travel expenses (the facility is located outside the city) are paid additionally |